On this page you will find pictures of the new building being erected (newest first) which started on Saturday, 13th May 2012.
I will update it as frequently as possible, bearing in mind that this will take place over a longer period of time than it took to demolish the old building!
Latest update: 4th July 2012

The walls going up – 4th July 2012

Ready to build – 2nd July 2012

The footings being laid – June 27th 2012

Infilling – June 14th 2012

The retaining wall – 12th June 2012

Protective coatings applied – 8th June 2012

The first part of the retaining wall – 30th May 2012

The cement being poured – 29th May 2012

Ready to pour – 29th May 2012

Site view 24th May 2012

Preparing for the big pour – 24th May 2012

Errecting the steel work – 24th May 2012

The end result! 23rd May 2012

The footings for the front wall – 23rd May 2012

The concrete is laid – 22nd May 2012

A close look at the steel work – 18th May 2012

Errecting the steel work – 18th May 2012

Putting up the shuttering – 15th May 2012

Marking out – 15th May 2012

Setting the levels – 14th May 2012

Is this the dice storage from our “Concrete Conkers” video?

25mm concrete screed for level checking

The first concrete is down. Checking levels.

Artists impression of the new Conference Hall